ØIf slope length longer than critical slope length, contouring fails allowing excessive rill erosion
ØFunction of:
-Storm severity, slope
steepness, cover-management,
EI distribution
ØCritical slope length extensions below strips depend on degree that strip spreads runoff
ØTerraces are used if changing cover-management or strips are not sufficient
ØSoil disturbance required to restore failed contouring
Ø
n