ØTo have contouring, must have ridge heights
-To have ridge height,
must have operation
-Ridge height assigned
in operation
ØRow grade
-Relative row grade
(preferred) or absolute
ØCreate contouring practices based on relative row grade (row grade/land slope)
-Perfect (0%), exceeds
NRCS specs (5%), meets specs
(10%), Cross slope (25%), Cross slope (50%)
ØName and save contouring practice