The entire slope length is
used when the analysis requires that the entire slope length be used. |
|
Examples include computing
sediment yield when deposition occurs on the slope or when deposition occurs
on the midpart of the slope and the slope length is needed to compute soil
loss on the lower part of the slope. |
|
See the next slide for
determining slope length when the analysis deals with computing soil loss for
the upper part of the slope. |