The entire slope length is used when the analysis requires that the entire slope length be used.
Examples include computing sediment yield when deposition occurs on the slope or when deposition occurs on the midpart of the slope and the slope length is needed to compute soil loss on the lower part of the slope.

See the next slide for determining slope length when the analysis deals with computing soil loss for the upper part of the slope.