Contouring/Cross Slope Farming
Ø To have contouring, must have ridge heights
- To have ridge height, must have operation
- Ridge height assigned in operation
Ø Row grade
- Relative row grade (preferred) or absolute
Ø Create contouring practices based on relative
row grade (row grade/land slope)
- Perfect (0%), exceeds NRCS specs (5%), meets
specs (10%),  Cross slope (25%), Cross slope
(50%)
Ø Name and save contouring practice